Environmental and Historical Center Master Plan and EcoGarden
For the degraded acres surrounding the Center, John Nystedt led Delaware Riverkeeper Network’s development of an Ecological Master Plan that included riparian buffer restoration, woodland restoration, trails, vegetated swales and two rain gardens. The objectives of the project were to create an ecologically appropriate and beautiful landscape, improve circulation, improve storm water management and water quality, improve native plant diversity, and increase learning opportunities. Phase 1 was completed with the construction of the EcoGarden including vegetated swales, rain gardens, trails, steps, and a “learning circle” installed by volunteers, the township and the Delaware Riverkeeper Network. Phase 2 is ongoing and includes monitoring and maintenance of the installation, supplemental seeding and plantings, invasive species management, and restoration of the wooded riparian corridor.
In addition to design and Master Plan co-authorship, John Nystedt worked with the township crews to guide swale and rain garden grading as well as path installation; led multiple volunteer events; managed planting budgets and purchased plants; and is providing ongoing leadership for stewardship events.
Role |
Co-writer/designer for Mgt. Plan and site design; management of town crew/vols; infiltration testing |
For |
Haddon Township NJ |
Type |
Site planning, design, installation |
One of the rain gardens (Photo credit: Delaware Riverkeeper Network)
Town crews began the project by clearing debris and mulch piles, installing paths, and grading the swales and rain gardens (Photo credit: Delaware Riverkeeper Network)
Town crew removed some invasive species (Photo credit: Delaware Riverkeeper Network)
Erosion control and temporary seeding at the bioswales (Photo credit: Delaware Riverkeeper Network)
Meadow sprouting 1st spring (Photo credit: Delaware Riverkeeper Network)
Winter seeding (greened up fast) compared to spring seeding (more bare) (Photo credit: Delaware Riverkeeper Network)
Meadow and path (Photo credit: Delaware Riverkeeper Network)
South rain garden, rough grading (Photo credit: Delaware Riverkeeper Network)
South rain garden graded and planted, late winter (Photo credit: Delaware Riverkeeper Network)
Rain garden, spring time (Photo credit: Delaware Riverkeeper Network)
Monitoring and removal/treatment of invasive species
Pollinator plantings and annuals near building (Photo credit: Delaware Riverkeeper Network)
A group of volunteers, with the mayor and commissioner, at the EcoGarden ribbon cutting (Photo credit: Delaware Riverkeeper Network)
Master Plan used for site restoration